master's thesis
Simulation Analysis of Railway Operations on the Double Track Line Dugo Selo - Novska

Filip Matešin (2016)
Metadata
TitleSimulacijska analiza željezničkog prometa na dvokolosiječnoj pruzi Dugo Selo - Novska
AuthorFilip Matešin
Mentor(s)Hrvoje Haramina (thesis advisor)
Abstract
U ovom radu izrađen je računalni model dvokolosiječne pruge Dugo Selo – Novska. Primjenom tog modela provedena je simulacijska analiza utjecaja izgradnje drugog kolosijeka na učinkovitost željezničkog prometa, te utjecaja dvokolosiječne pruge na taktni vozni red na relaciji Novska – Zagreb Glavni kolodvor. Rezultati analize pokazuju da je izgradnja dvokolosiječne pruge potrebna s obzirom na nedostatak kapaciteta postojeće jednokolosiječne pruge.
Keywordssimulation modelling double track line Dugo Selo – Novska cyclic timetable
Parallel title (English)Simulation Analysis of Railway Operations on the Double Track Line Dugo Selo - Novska
Committee MembersHrvoje Haramina (committee chairperson)
Tomislav Josip Mlinarić (committee member)
Marjana Petrović (committee member)
Mladen Nikšić (committee member)
GranterSveučilište u Zagrebu
Fakultet prometnih znanosti
Lower level organizational unitsPromet
Zavod za željeznički promet
PlaceZagreb
StateCroatia
Scientific field, discipline, subdisciplineTECHNICAL SCIENCES
Traffic and Transport Technology
Road and Rail Transport
Study programme typeuniversity
Study levelgraduate
Study programmeTraffic and Transport; specializations in: Road Traffic and Transport, Railway Traffic and Transport, Water Traffic and Transport, Air Traffic and Transport, Postal Traffic, Information and Communication Traffic, Urban Traffic and Transport
Study specializationRailway Traffic and Transport
Academic title abbreviationmag. ing. traff.
Genremaster's thesis
Language Croatian
Defense date2016-09-27
Parallel abstract (English)
In this work computer model of double track railway line Dugo Selo – Novska is created. By application of this model simulation analysis of the impact of construction of the second track on the efficiency of rail transport and the impact of double track on the cyclic timetable from Novska - Zagreb Glavni kolodvor is conducted. Results of the analysis show that the construction of the double track is necessary due to the lack of capacity of the existing single track line.
Parallel keywords (Croatian)simulacijsko modeliranje dvokolosiječna pruga Dugo Selo - Novska taktni vozni red
Resource typetext
Access conditionOpen access
Terms of usehttp://rightsstatements.org/vocab/InC/1.0/
URN:NBNhttps://urn.nsk.hr/urn:nbn:hr:119:592261
CommitterMojca Brenko-Puzak